The planning platform for trade contractors

One plan.
Schedule, labour, and production — connected.

When the general contractor moves a milestone, your crew plan and your production targets move with it. Automatically. And every field update becomes part of a record you can stand behind.

Early access for trade contractors. No sales call, no spam.

Thanks — you're on the list. We'll be in touch before the first pilots start.

You commit to production rates at bid, plan the schedule somewhere else, and staff the crews somewhere else again. Nothing talks to anything until closeout.

How Sightline is different

Three plans that finally know about each other

Every trade contractor plans the same three things. In most companies those plans live in three unrelated tools, so a change in one never reaches the others. Sightline makes them a single loop.

01

The schedule

Built from your takeoff, benchmarked against real production rates, and diffed against every GC revision as it lands.

02

The labour

A demand curve derived from that schedule — never hand-loaded. Compress the work and the curve reshapes itself.

03

The production

Installed rates measured against benchmark while the job is live, flagged in both directions — not reviewed at closeout.

And back again. Those actuals recalibrate the benchmarks the next schedule is built from — so the plan gets more accurate with every job you run.

Most tools own one leg of this. Only a platform that holds all three can close the loop.

01 · Plan the schedule

Know the moment it changes

Hand Sightline a takeoff and it builds the baseline — tasks, durations, sequence — from real production rates, then hands it to you to edit before anything is committed. Hand it the GC's PDF and it tells you what moved since the last revision, with the slips that touch your scope sorted to the top.

You stop finding out at the coordination meeting.

  • Reads GC schedules as they actually arrive — including scanned, image-based PDFs
  • Compares across every past revision, not just the last one
  • Nothing is discarded: changes outside your scope collapse under a count
  • Flags durations that drift from benchmark in both directions
GC Schedule Comparison · Rev 15 → Rev 16 47 changes
Level 3 — Ceiling close-in Finish 12 Mar → 02 Apr · touches your scope +21d
Level 2 — Drywall board Float reduced 9d → 2d −7d
Electrical room energisation Start pulled forward · duration unchanged −4d
43 further changes outside your scope collapsed
4 changes touch your scope · 1 material Draft notice →
02 · Plan the labour

From the schedule, not a spreadsheet

Your labour demand curve is computed from live schedule data, so it is never stale. See demand against real supply across every job at once — and spot the week you go short while there's still time to do something about it.

When a GC revision compresses six weeks of work into four, the curve already knows. Nobody re-keys a forecast.

  • Broken out by foreman, journeyman and apprentice — not one flat headcount
  • Jobs you haven't won yet contribute forecast demand, held out of committed capacity
  • Company supply overlaid, net of time off, loans and existing assignments
  • Every override attributed, with a reset back to derived
Company Labour Demand · all active jobs 14 short · wk 10
0 35 70 TODAY 14 short
Foreman Journeyman Apprentice  ·  Available crew 6 jobs
Override, don't rebuild

Open any job and every week is editable against the derived number. Change one and it's stamped with who changed it and why — and one click puts it back.

Ratios watched, never enforced

Apprentice ratio and supervision span checked live against your configured limits. Out of band, it flags. It never stops you staffing the job.

Shortfalls become requests

Where demand outruns supply, Sightline proposes a labour request with the gap already counted. It never fills one by itself — someone accepts or dismisses it.

Moves that payroll knows about

Bench, loans and transfers are real records with authority checked and overlaps barred outright — not a verbal arrangement that surfaces on a timesheet three weeks later.

03 · Plan the production

While you can still do something about it

Installed rates are measured against benchmark as the work happens and flagged in both directions — running slow is the contractually dangerous one, running fast often means the estimate was wrong or your float is being squeezed.

Those rates roll up across every project into a production history that belongs to you: per cost code, with thin data honestly marked rather than quietly averaged.

  • Compared three ways — against the prior period, to-date, and budget
  • Direct and indirect labour properly separated, so supervision doesn't skew your rates
  • Field crews tag adverse weather and restricted access against the actual
  • Adoption scored on work actually produced, not on who logged in
Company Production · trailing 12 months by cost code
Conduit rough-in — EMT ≤ 1" 14 projects · spread 4.1 – 6.8 5.06 LF/hr
Wire & cable pull 17 projects · spread 21.4 – 33.9 27.7 LF/hr
Terminations — control 6 projects · thin data, treat with caution 3.2 ea/hr
Level 3 branch rough-in · Maple Ridge Running 28% below your own benchmark −28%
Rates from approved field updates only Copper Creek Electrical
Across the whole company

The question no schedule can answer

Any scheduling tool will tell you what one job needs. None of them can tell you whether you have the people for all of them — plus the three you're bidding — in October. That question gets answered on a whiteboard, from memory, by whoever has been there longest.

Every job adds up to one number

Sightline holds the schedule for every project you're running, so it can total them. One demand curve across the whole company, broken out by classification, with your real supply laid over it — net of time off, loans, and assignments already made.

Work you haven't won yet contributes its own demand, held separately so it never inflates committed capacity. You can see what happens if you win it. You're never staffing against it by accident.

That's the view that decides whether you hire, call the hall, sub it out, or turn the work down.

Capacity · all jobs 1 stale
6Active jobs
5With baseline
4Forecast current
1Stale
JobStageOn siteWk 10
Maple Ridge CommonsActive2424
Fraser Health AnnexActive1726
Riverbend TransitActive99
Northgate CivicBidding14
Committed 62 · available 48 14 short · wk 10
One bench, not six

Who's free this week anywhere in the company — not who's free on the job you happen to have open. Nobody sits idle on one site while another runs short.

Moves between jobs

Loans and transfers with a lending authority, a return date and overlaps barred outright. The move is a record, not a phone call somebody half remembers.

Shortfalls become requests

Where the company comes up short, Sightline proposes a request with the gap counted — to fill off the bench, out of the hiring hall, merit, or a sub.

Stale forecasts surface

A capacity audit across the portfolio shows which jobs have a baseline, which have a current forecast, and which have quietly gone out of date.

Next Group the same curve by your dimensions — hiring hall, superintendent, work area, or any tag you define — so the question you ask is the chart you get.

This only works if every job is in it. Which is exactly why we don't charge you per job.

The record underneath

Every number carries a name and a timestamp

Sightline isn't a claims tool. It's a planning tool that happens to leave a defensible trail behind it — so the documentation is already built by the time you need it, instead of reconstructed under pressure after the window has closed.

The field owns its figures

A reviewer has two options: approve, or send it back with a reason. There is no approver override. Nobody's number gets quietly rewritten by someone who wasn't there.

Small slips are never silent

Contract notice obligations turn on when you became reasonably aware. Sightline logs and timestamps a slip the day it appears, whether or not it's big enough to act on.

Nothing is sent on your behalf

Sightline drafts a delay notice from confirmed evidence and freezes it as a PDF on your letterhead, ready to issue. A human authorises every transmission. No exceptions.

"Marcus reported 260 LF" is a stronger artefact than "Marcus reported 300, and the office corrected it to 260." — Why Sightline has no approver override
Built for where the work happens

The signal drops. The plan shouldn't.

Progress capture runs in the browser on the phone already in your foreman's pocket — no app store, no install, no IT project. It keeps working with no connection and syncs itself the moment there's signal again.

01Works with no connectionEntries, quantities and photos queue on the device and sync automatically on reconnect. Nothing is lost and nothing is entered twice.
02Under a minute per taskLarge tap targets sized for gloves. Photo capture is one tap and can be skipped.
03No benchmark pressure in the fieldFlags fire in the office at review, never on the entry screen — so what the field reports stays unbiased.
04Daily plans on your letterheadPrintable crew plans and two-week look-aheads carry your company's identity, never ours.
Who it's for

From the tools to the boardroom

One picture of the job, cut five ways for the five people who need it.

Foreman

Tomorrow's crew list is right, and logging today's progress takes under a minute — signal or not.

Superintendent

Where your people are, where they should be, and who's on the bench this week.

Project Manager

The GC moved something. What did it cost you, and can you prove it?

Operations

How many hands you need in week 14, across every job, before you're short.

Executive

Which jobs are bleeding, which estimates were wrong, and whether the team is actually using this.

Pricing posture

Everyone on the job. One price.

You shouldn't have to decide who deserves a login. Pricing scales with your business, not your headcount — published, not quoted.

Every person Unlimited users

Foreman to executive, no seat counting. A tool half the company can't open is worth nothing.

+
Every job Unlimited projects

Leave jobs out and the labour curve is wrong and the benchmarks are thin. So we don't charge you per job.

Published pricing at launch.

Where we're at

Built. Not yet proven on your job.

We'd rather tell you that plainly than dress it up. Here's exactly where this stands.

01

The platform is built

Scheduling, GC schedule analysis, offline field capture, company labour planning and production tracking. Running today, not a mockup.

02

It hasn't run a live job yet

No pilots, no customers, nothing we can point at and call proof. That's the honest position, and it's exactly what we're looking to change.

03

Founding partners shape what ships

Run real work through it and tell us where it breaks. What you need next is what gets built next — while there are few enough of you for that to mean something.

Early access

Stop guessing where the job is.
Start proving it.

Bring two revisions of a GC schedule from one of your own jobs. We'll show you exactly what changed between them — and what it cost you.